Sign In | Join Free | My enlightcorp.com
China Wincoo Engineering Co., Ltd. logo
Wincoo Engineering Co., Ltd.
Wincoo Engineering Co., Ltd.
Verified Supplier

1 Years

Home > Belt Move Heavy Machine >

Heavy Belt Moving Pipeline Laying Equipment For Construction Works

Wincoo Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Heavy Belt Moving Pipeline Laying Equipment For Construction Works

Place of Origin : Jiangsu, China

Brand Name : WINCOO

Packaging Details : Export package

Supply Ability : 3000 Set/Sets per Month

Price : $126,500.00/sets 1-99 sets

Condition : New

Warranty : 1 Year

Applicable Industries : Manufacturing Plant, Construction works

Weight (KG) : 22000

Showroom Location : None

Video outgoing-inspection : Provided

Machinery Test Report : Provided

Marketing Type : Ordinary Product

Warranty of core components : 1 Year

Core Components : PLC, Engine, Motor, Pump

UNIQUE SELLING POINT : High operating efficiency

Product name : Conveyor Track Shifter

Application : Pipeline construction machinery

After-sales Service Provided : VIDEO SUPPORT

Key Word : Belt Move Heavy Machine

Contact Now

WINCOO ENGINEERING CO.,LTD
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipment for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction, industrial production lines, clean energy project and other industrial field.
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
HGS70 Belt move heavy machine is designed for shifting belt conveyor on working site of strip mine, it can shift maximum 2500mm belt conveyor, you can shift the belt conveyor by operating the hydraulic shifting head in driver’s cabin, without manual intervention, which can greatly improve belt shifting efficiency.
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Product Features
1. Fast moving speed.
2. Strong lifting capacity and stretchable weight.
3. Complete safety devices to ensure the safety of the moving and setting process.
4. 2 cooperative operations can improve efficiency.
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Standard Overall size
W1-Caterpillar track
2380mm
W2-Outside edge dimension of track
3140mm
W3-Transport width
3350mm
W4-Shift head distance (optional)
1805mm
L1-Grounding length
3620mm
L2-The whole machine length
5630mm
L3-Boom length (optional)
4500mm
H1-Height (suggested)
150mm
H2-Top bridge height
3540mm
H3-Overall height (standard boom)
4835mm
Product Parameters
Model
PYS70-2
Engine type
Commins NTA855-C360
Rated engine power/speed
235/2000 kW/rpm
Machine weight
49T
Overall dimensions
5780×6850×3950 mm
Maximum shift weight
16T
Maximum lift
300 mm
Set the maximum shift distance
1000 mm
Suitable for rail specification
50 ~ 75 kg/m(GB 2585)
Walking speed
Forward 1 block
3.6 km/h
Forward 2 block
6.6 km/h
Forward 3 block
11.5 km/h
Back 1 block
4.4 km/h
Back 2 block
7.8 km/h
Back 3 block
13.5 km/h
Mode of operation
Hydraulic shift head, handle operation
Shift head clamp indication
The optional
Moving head surveillance camera
The optional
Switchable dozer
320 horsepower dozer
Product Photos
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.

Our Services & Strength
We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.

Based client’s facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.

To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works
Heavy Belt Moving Pipeline Laying Equipment For Construction Works

Product Tags:

Heavy Pipeline Laying Equipment

      

Belt Moving Pipeline Laying Equipment

      

Heavy Crawler Pipe layer

      
Quality Heavy Belt Moving Pipeline Laying Equipment For Construction Works for sale

Heavy Belt Moving Pipeline Laying Equipment For Construction Works Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Wincoo Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)